Salient Features
Of Gulbarga Demonstration Zone 24X7 Water Supply
|
Total number of covered under demo zone |
: |
11 Wards (7 part and 4 full) |
|
List of part wards covered under demo zone |
: |
6, 19, 24, 33, 42, 43 and 49 |
|
List of full wards covered under demo zone |
: |
17, 23, 32 and 44 |
|
Areas covered under demo zone |
: |
Shah Bazar, Wadargalli, Kadgharpur, Lalgiri, Sharan Nagar, Vittal
Nagar, Garden area, Gazipur, Super Market, Kirana Bazar, Lohar galli
and Bamboo bazar.
|
|
Source of water supply demo zone
Bulk water provision for demo zone.
|
:
: |
Bennethora River
GLSR at Old Filter bed area. |
|
Population of demo zone (2006)
Water demand (2006)
|
: : |
64,242
6.87 MLD (1.5 MGD) |
|
Population of demo zone (2008)
Water demand (2008) |
:
: |
66,831
7.15 MLD (1.6 MGD) |
|
Population of demo zone (2020)
Water demand (2020) |
:
: |
84,758
10.52 MLD (2.3 MGD) |
|
Population of demo zone (2035)
Water demand (2035) |
:
: |
114,073
14.91 MLD (3.3 MGD) |
|
Total number of properties in demo
zone |
: |
3,810 |
DEMO ZONE
WATER SUPPLY DISTRIBUTION SYSTEM PIPE LINE CONTRACT:
|
Name of the Contractor |
: |
Jain Irrigation Systems Limited, Jalgaon |
|
Contract duration |
: |
7 months. |
|
Notice to proceed |
: |
23rd January, 2006 |
|
Intended date completion date |
: |
23rd August, 2006 |
PROGRESS
OF DEMO ZONE WORKS AS ON August 03, 2006
A. DISTRIBUTION SYSTEM PIPELINES:
|
HDPE Pipe Diameter (mm) |
63 |
110 |
160 |
200 |
315 |
400 |
Total |
|
Proposed length of pipelines (m)
|
23,468 |
14,385 |
4,770 |
2,224 |
1,559 |
1,461 |
47,867 |
|
Pipelines (m) |
13,142 |
9,688 |
1,463 |
648 |
290 |
681 |
25,912 |
|
% of work completed |
56% |
67% |
31% |
29% |
19% |
47% |
54% |
B.
HSC CONNECTIONS:
|
Size of HSC (mm) |
20 |
32 |
Total |
|
Proposed House Service Connections
(No.) |
3300 |
720 |
4020 |
|
Connected House Service Connections
(No.) |
18 |
0 |
18 |
|
% of connections provided |
0.5% |
0% |
0.4% |
|